Jupiter Power Battambang

Sector: Power Transmission • Location: Cambodia

Source: World Bank Group

Project
Active

Jupiter Power was a 51:49 joint venture between Maxim Power and U.S.-based Caterpillar Power Ventures International. The oil-fired C-1 station was in the capital city of Phnom Penh, and was developed in two phases.

The first phase of the C-1 plant comprised ten 1.5-MW generators, which entered service in September 2000. The US$10 million project was initially financed with support from the Ov

Project Information FAQ

Project Information

4 Q
The project “Jupiter Power Battambang” is an infrastructure initiative in the Power Transmission sector, located in Cambodia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Jupiter Power was a 51:49 joint venture between Maxim Power and U.S.-based Caterpillar Power Ventures International. The oil-fired C-1 station was in the capital city of Phnom Penh, and was developed in two phases. The first phase of the C-1 plant comprised ten 1.5-MW generators, which entered service in September 2000. The US$10 million project was initially financed with support from the Overseas Private Investment Corp. The renewable three-year PPA signed in late 1999 required the state power utility Electricite de Cambodge (EdC) to buy at least 60% of the capacity on a take-or-pay basis. In July of 2003, EdC agreed to extend the power purchase agreement for the C-1 plant until December 2005. In May 2002, Jupiter Power agreed to add 6 MW of capacity by December 2002 under a three-year renewable contract on the same power purchase terms as the first phase. The project entered service in December 2002 at a cost of US$2.1 million, and was wholly financed by the Caterpillar Financial Services Corp. Also pursuant to the 2003 PPA extension, EdC had agreed to the relocation of Jupiter Power's closed independent power project in Pursat to the C-1 facility. This 1-MW plant was to bring the total capacity of the C-1 facility to 22-MWs. www.maximpowercorp.com None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data