Justice Building Front Entrance Modifications
One of 10,000+ projects Taiyo tracks in North Carolina.
Source: Dodge
ADA modifications to front entry of existing building entrances and ADA access to elevated floor level; replacement of ADA Lift, revolving door, and 2 existing single entrance doors; and replacement of electrical, security access, card readers, and door operators. Designer will need to address historic components and historic surrounding finishes for the building. 2. Removal and replacement of exi
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial), Government
- Location
- Raleigh, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Justice Building Front Entrance Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ADA modifications to front entry of existing building entrances and ADA access to elevated floor level; replacement of ADA Lift, revolving door, and 2 existing single entrance doors; and replacement of electrical, security access, card readers, and door operators. Designer will need to address historic components and historic surrounding finishes for the building. 2. Removal and replacement of existing carpet in office areas 3. Painting of interior office spaces |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Raleigh |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial), Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
