K-96 Bridge Redeck Project at Maize Road
Sector: Bridge • Location: Wichita, Kansas, United States
Source: Wichita Eagle
A $3.9 million bridge redeck project involving the removal of the middle parts of the K-96 bridges at Maize Road. The project includes demolition of the outer parts of the bridge and is expected to be completed in January 2027. The road will be fully closed from April 24 to April 26 for middle-span removal, with flaggers directing traffic during demolition starting April 23.
- Status
- Under Construction
- Sector
- Bridge, Road
- Location
- Wichita, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Wichita Eagle
ConstructChat
Ask ConstructChat about K-96 Bridge Redeck Project at Maize Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $3.9 million bridge redeck project involving the removal of the middle parts of the K-96 bridges at Maize Road. The project includes demolition of the outer parts of the bridge and is expected to be completed in January 2027. The road will be fully closed from April 24 to April 26 for middle-span removal, with flaggers directing traffic during demolition starting April 23. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Wichita |
Source
Source | Wichita Eagle |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2026-04-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States
- Atlas Air Worldwide and Titan Aviation Holdings Announce Financing Facilities with CDPQ, BNP Paribas, and volofin
- Route 29 Tunnel, Trenton, NJ
- Ortega Highway Interchange Replacement Project
- Elgin O’Hare Western Access Project, Illinois
- Queen Elizabeth Way Widening
- I-485 Charlotte Outer Loop, North Carolina
- Kosciuszko Bridge Replacement Project, New York, US
- Complete 540 (Triangle Expressway Southeast Extension), North Carolina
