K-Water Star Patrind HPP
Sector: Water Supply and Storage • Location: Pakistan
Source: World Bank Group
Star Hydro Power Ltd., jointly owned by Korea Water Resources Corporation (KSE:071320) (80%), Daewoo Engineering & Construction Corporation (KSE:047040) and Sambu Construction Corporation (KSE:001470) via their joint investment vehicle KDS Hydro (Singapore), was planning the development of the 147MW Patrind Hydropower plant, run-of-river, between Kunhar River and Jhelum river, Muzaffarabad distric
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Star Hydro Power Ltd., jointly owned by Korea Water Resources Corporation (KSE:071320) (80%), Daewoo Engineering & Construction Corporation (KSE:047040) and Sambu Construction Corporation (KSE:001470) via their joint investment vehicle KDS Hydro (Singapore), was planning the development of the 147MW Patrind Hydropower plant, run-of-river, between Kunhar River and Jhelum river, Muzaffarabad district, Patrind. Star Hydro Power Ltd. is incorporated via KDS Hydro Private Limited, Singapore. The project was to operate under a 30 year PPA with National Transmission and Dispatch Company (NTDC), a state-owned singlebuyer. Commissioning was expected for December 2016. The project was developed under a BOOT contract, with 30 year concession. EPC contractor was Sambu Construction Company. The project reached financial closure in January 2012. The IFC and the Islamic Development Bank (IDB) provided $60 million each. IFC was to provide a $60 million loan. IDB was to provide a $60 million lease financing. In October 2011, the ADB decided to provide $97 million in loans. Total cost was estimated at $409-436 million. Part of the financing was to be provided by the Export-Import Bank of Korea ($110 million, announced May 2011). Debt/equity ratio is 70/30. Legal advisers to the lenders were Shearman & Sterling. Legal advisers to the sponsor were Rizvi, Isa, Afridi & Angell. Financial advisers were Habib Bank, and United Bank. MIGA provided a guarantee to cover (a portion of) the equity investment of K-Water, to the amount of US$148.5 million for a period of 20 years. The guarantee covers breach of contract. MIGA approved the guarantee in May 2012 (project id: 10003). http://www.miga.org/projects/index.cfm?pid=1007 Source: Asia Pulse: S.Korea's Eximbank to Fund Pakistani Power Plant Project (2 May 2011). ADP Debt News: ADB to provide credit for 147 MW hydropower project in Pakistan (13 October 2011). http://www.ppib.gov.pk/N_hydel_under_const.htm http://www.nepra.org.pk/Tariff/IPPs/Star%20Hydropower/Star%20Hydro%20Power%20Limited.pdf |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
