k2 Tpa Office Building
Sector: Residential • Location: Tampa, Florida, United States of America
Source: Dodge
"Early start for interior, non-structural work ONLY. No inspections may be scheduled until the permit is issued." Interior Renovation of Suite 300 and Suite 700. Including architectural, mechanical, electrical and plumbing. Office Space Comm Alter Sq Ft:28225
- Status
- Prospective
- Sector
- Residential, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Tampa, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about k2 Tpa Office Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | "Early start for interior, non-structural work ONLY. No inspections may be scheduled until the permit is issued." Interior Renovation of Suite 300 and Suite 700. Including architectural, mechanical, electrical and plumbing. Office Space Comm Alter Sq Ft:28225 |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Tampa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Residential, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- CR 347/ DAVID'S HOME CHURCH RD @ SCULL SHOAL CREEK
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
