logo

Kabeli Transmission Project

Sector: Power Generation (CCGT) • Location: Nepal

Source: World Bank Group

Project
Closed

The objectives of Kabeli Transmission Project are: to support the addition of transmission capacity to the Integrated Nepal Power System; and to provide access to electricity and cooking fuel to communities in the area of the Kabeli 132 kV transmission line. This project has 3 components. Component 1 will construct a new 132 kV transmission line in eastern Nepal, with associated technical assistan

Status
Closed
Sector
Power Generation (CCGT), Hydro, Government
Location
Nepal
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kabeli Transmission Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kabeli Transmission Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Nepal. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of Kabeli Transmission Project are: to support the addition of transmission capacity to the Integrated Nepal Power System; and to provide access to electricity and cooking fuel to communities in the area of the Kabeli 132 kV transmission line. This project has 3 components. Component 1 will construct a new 132 kV transmission line in eastern Nepal, with associated technical assistance. Component 2 will install distribution lines and associated infrastructure to provide access to electricity to communities in the area of the transmission line, with associated technical assistance. Component 3 will provide access to electricity and cooking fuel through off-grid schemes in communities for which grid extension (Component 2) is not a feasible option, with associated technical assistance.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Nepal

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project