Kachi Lithium Project Phase One
One of 32 projects Taiyo tracks in Catamarca.
Source: Smallcaps
The Kachi lithium project is advancing with progress on direct lithium extraction (DLE) technology and regulatory milestones, including the Exploitation Environmental Impact Assessment (EIA) targeted for the first half of 2026. The project includes efforts to optimize power supply with a completed Front-End Engineering Design (FEED) study for power delivery, aiming to reduce operating costs and se
- Status
- Prospective
- Sector
- Power Generation (CCGT), Bridge
- Location
- Catamarca, Argentina
- Updated
- 22 Jul 2026
- Source
- Smallcaps
ConstructChat
Ask ConstructChat about Kachi Lithium Project Phase One
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Kachi lithium project is advancing with progress on direct lithium extraction (DLE) technology and regulatory milestones, including the Exploitation Environmental Impact Assessment (EIA) targeted for the first half of 2026. The project includes efforts to optimize power supply with a completed Front-End Engineering Design (FEED) study for power delivery, aiming to reduce operating costs and secure a reliable grid connection. The project is underpinned by Gen 4 ion-exchange DLE technology with potential upside from Gen 5 technology. Construction Capex for Phase One is estimated at US$1.16 billion, requiring a broader funding package including partner equity and strategic project financing. |
Original sector | Mining & Resources |
Budget |
Location
Country | Argentina |
State | Catamarca |
Source
Source | Smallcaps |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Bridge |
Article published date | 2026-04-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
