KADANA IRRIGATION
One of 10,000+ projects Taiyo tracks in India.
Source: World Bank Group
The project includes: (a) construction of the Kadana Dam on the Mahi River; (b) expansion of the existing irrigation system on the right bank from 143,000 ha to 263,000 ha; (c) construction of a new irrigation system on the left bank to serve about 20,000 ha; (d) construction of watercourses and field channels throughout the project area; (e) remodeling and expansion of the drainage systems; (f) l
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Hydro, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KADANA IRRIGATION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes: (a) construction of the Kadana Dam on the Mahi River; (b) expansion of the existing irrigation system on the right bank from 143,000 ha to 263,000 ha; (c) construction of a new irrigation system on the left bank to serve about 20,000 ha; (d) construction of watercourses and field channels throughout the project area; (e) remodeling and expansion of the drainage systems; (f) land leveling of about 42,000 ha; and (g) upgrading of existing roads and construction of new district village and farm-to-market roads totaling about 3,200 km. It also includes groundwater investigations, a study of water charges, a trial land consolidation program and construction of trial-cum-demonstration farms. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
