Kading Cabin Foundation Construction
Closed · Montana · Last reported Aug 2024
Source: Dodge USA
The contractor shall provide all labor, materials, equipment, quality control, project management and any services necessary to satisfactorily complete, but not be limited to the, following tasks in support of this construction project: mobilization; pouring of concrete foundation; earthwork; and, drainage installation.
- Status
- Closed
- Sector
- Cement, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Helena, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Kading Cabin Foundation Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The contractor shall provide all labor, materials, equipment, quality control, project management and any services necessary to satisfactorily complete, but not be limited to the, following tasks in support of this construction project: mobilization; pouring of concrete foundation; earthwork; and, drainage installation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Helena |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
