logo

Kael Solar PV Plant

Sector: Solar • Location: Senegal

Source: World Bank Group

Project
Active

The project involves the financing, design, construction, commissioning, operation and maintenance of a 25 MW Kael solar power plant located in Diourbel region of Senegal. The project, also known as Toube PV Solar Plant, was announced together with the Kahone Solar plant. Both projects are developed under World Bank Group's Scaling Solar program. Engie and Meridiam were the preferred bidders for

Project Information FAQ

Project Information

5 Q
The project “Kael Solar PV Plant” is an infrastructure initiative in the Solar sector, located in Senegal. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the financing, design, construction, commissioning, operation and maintenance of a 25 MW Kael solar power plant located in Diourbel region of Senegal. The project, also known as Toube PV Solar Plant, was announced together with the Kahone Solar plant. Both projects are developed under World Bank Group's Scaling Solar program. Engie and Meridiam were the preferred bidders for both projects having entered the lowest bids of $0.039831/kWh. The generated electricity will be sold to the national utility Société Nationale d'Électricité du Sénégal (Senelec) under 25-year take-or-pay Power Purchase Agreement (PPA). The SPV is called Kael Solaire SA and owned as follows: owned 40% by Engie Global Developments BV, 26.3% by Meridiam Infrastructure Africa Fund FIPS, 13.7% by Meridiam Infrastructure Africa Parallel Fund FIPS and 20% by Senegalese Sovereign Wealth Fund for Strategic Investments (FONSIS). The project cost is EUR 22 million or $ 24.7 million. The debt package for Kahone plant is as follows: IFC providing EUR 7 million or $ 7.9 million (A loan - €3.5 million, Finland-IFC Blended Finance for Climate Programme - €3.5 million); Proparco providing EUR 6.5 million or $ 7.3 million and EIB providing EUR 6 million or $ 6.7 million. In addition, MIGA issued guarantees of up to EUR 6.9 million or $ 7.6 million covering equity and shareholder loan investments for both Kahone and Kael projects by Engie Global Developments BV, Meridiam Infrastructure Africa Fund FIPS and Meridiam Infrastructure Africa Parallel Fund FIPS. Financial close was reached on 18 July 2019, while commercial close was achieved on 13 November 2018. https://ifcextapps.ifc.org/IFCExt/Pressroom/IFCPressRoom.nsf/0/F132145C7A245A8B8525843B005B5225 https://disclosures.ifc.org/#/projectDetail/SII/38959 https://disclosures.ifc.org/#/projectDetail/ESRS/38959 http://www.meridiam.com/en/news/article/meridiam-achieves-financial-close-for-two-solar-projects-in-senegal https://www.miga.org/project/scaling-solar-senegal https://www.scalingsolar.org/scaling-solar-senegal-reaches-commercial-close/ https://ijglobal.com/articles/141775/kahone-and-toube-solar-pv-senegal

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data