logo

Kai Tak Development Infrastructure Works

Sector: Bridge • Location: Hong Kong

Source: East Development Office

Project
Ongoing

The scope of Stage 2 comprises: construction of the following items of works mainly located at the former runway – (i) realignment and widening of the existing single 2-lane Shing Fung Road to form a dual 2-lane distributor road of about 1.4 kilometres (km) long; (ii) associated single 2-lane roads (including a vehicular underpass) with a total length of about 0.6 km branching off from the realign

Project Information FAQ

Project Information

5 Q
The project “Kai Tak Development Infrastructure Works” is an infrastructure initiative in the Bridge sector, located in Hong Kong. Taiyo aggregates data on it from East Development Office.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The scope of Stage 2 comprises: construction of the following items of works mainly located at the former runway – (i) realignment and widening of the existing single 2-lane Shing Fung Road to form a dual 2-lane distributor road of about 1.4 kilometres (km) long; (ii) associated single 2-lane roads (including a vehicular underpass) with a total length of about 0.6 km branching off from the realigned Shing Fung Road to the sites along the road; (iii) an elevated landscaped deck with lifts and staircases of about 1.4 km long with minimum 11 metres (m) in width above the realigned Shing Fung Road serving as part of a semi-enclosure noise barrier and also as a public open space; and (iv) roadside noise barriers with a total length of about 1.1 km long alongside the realigned Shing Fung Road and integrated with the elevated landscaped deck; upgrading of the existing single 2-lane carriageway of about 0.3 km long on Kai Tak Bridge to a dual 2-lane carriageway; improvement to three existing road junctions along Wang Chiu Road at its junctions with Kai Cheung Road, Lam Hing Street and Sheung Yee Road in Kowloon Bay; construction of associated footpaths, pedestrian streets, street lighting, traffic aids, drainage, sewerage, water mains, landscaping and ancillary works; and implementation of environmental mitigation measures and an environmental monitoring and audit programme for the works mentioned above. The scope of Stage 3 comprises: construction of the following items of works located at the former south apron area – (i) reconstruction and widening of Shing Cheong Road and part of Cheung Yip Street from the existing single 2-lane roads to form dual 2-lane roads with a total length of about 0.7 km; and (ii) construction of a supporting underground structure of about 0.4 km long along Shing Cheong Road and across Cheung Yip Street as enabling works to facilitate future construction of Trunk Road T2; construction of associated footpaths, pedestrian streets, street lighting, traffic aids, drainage, sewerage, water mains, landscaping and ancillary works; and implementation of environmental mitigation measures and an environmental monitoring and audit programme for the works mentioned above.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data