Kairos I Wind Farm
Sector: Wind • Location: Brazil
Source: World Bank Group
The project involves the construction of Kairos I wind farm, located in the state of Ceara, Brazil. This is the first stage of the Kairos wind complex, which will have a total installed capacity of 261MW once completed. The project sponsor, Sao Paulo based company 2W Energia, signed a $29.6m (R$147m) debt package with regional development bank Banco do Nordeste do Brasil to fully finance the 36 wi
- Status
- Prospective
- Sector
- Wind, Power Generation (CCGT), Raw Materials, Manufacturing (Industrial), Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Kairos I Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of Kairos I wind farm, located in the state of Ceara, Brazil. This is the first stage of the Kairos wind complex, which will have a total installed capacity of 261MW once completed. The project sponsor, Sao Paulo based company 2W Energia, signed a $29.6m (R$147m) debt package with regional development bank Banco do Nordeste do Brasil to fully finance the 36 wind farm. The 24-year debt has a 2-year grace period before first repayment and is priced at IPCA plus 3.7423%. Construction is slated to begin in June 2022 and the project is expected to be operational in May 2023. Financial close was achieved on 29 April, 2022. Realfin https://www.ijglobal.com/articles/164138/2w-finances-brazilian-wind |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Raw Materials, Manufacturing (Industrial), Government |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
