logo

Kairouan Solar Photovoltaic Project

Sector: Solar • Location: Kairouan, Tunisia

Source: African Development Bank Group

Project
Completed

The Kairouan solar power plant is a 120 MWp photovoltaic project in Tunisia that strengthens the country's energy security and advances its transition to renewable energy. It is the first project in Tunisia to exceed 100 MW of installed capacity and to inject renewable electricity into the 225-kilovolt high-voltage grid of the Tunisian Company of Electricity and Gas (STEG). The plant generates 222

Status
Closed
Sector
Solar, Power Generation (CCGT), Power Transmission, Government
Location
Kairouan, Tunisia
Updated
22 Jul 2026
Source
African Development Bank Group

ConstructChat

Ask ConstructChat about Kairouan Solar Photovoltaic Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kairouan Solar Photovoltaic Project” is an infrastructure initiative in the Solar sector, located in Kairouan, Tunisia. Taiyo aggregates data on it from African Development Bank Group.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Kairouan solar power plant is a 120 MWp photovoltaic project in Tunisia that strengthens the country's energy security and advances its transition to renewable energy. It is the first project in Tunisia to exceed 100 MW of installed capacity and to inject renewable electricity into the 225-kilovolt high-voltage grid of the Tunisian Company of Electricity and Gas (STEG). The plant generates 222 GWh of clean electricity annually, supplying nearly 43,000 households and reducing CO2 emissions by around 117,000 tonnes per year.

Original sector

Energy & Power

Budget

Location

Country

Tunisia

City

Kairouan

Source

Source

African Development Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Power Transmission, Government

Article published date

2025-12-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project