Kairouan Solar Plant
Sector: Raw Materials • Location: Tunisia
Source: International Finance Corporation (IFC)
The proposed investment seeks to support a 100MW solar photovoltaic (“PV”) project in Tunisia (the “Project”) which was awarded in 2019 following a competitive tender to a consortium coordinated and led on an operational day-to-day basis by AMEA Power Ltd (“AMEA” or the “Company”). AMEA is an Emirati based renewable energy company founded in 2016 and headquartered in Dubai. The Project Company, a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed investment seeks to support a 100MW solar photovoltaic (“PV”) project in Tunisia (the “Project”) which was awarded in 2019 following a competitive tender to a consortium coordinated and led on an operational day-to-day basis by AMEA Power Ltd (“AMEA” or the “Company”). AMEA is an Emirati based renewable energy company founded in 2016 and headquartered in Dubai. The Project Company, a special purpose vehicle, Kairouan Solar Plant Sarl. (“KSP”) has been set-up. IFC (the “Lender”) will provide up to US$20 million from its own account and up to $17 million from IFC as implementing entity of the Clean Technology Fund; additional funds will be provided by African Development Bank (together with IFC and AfDB, the “Lenders”). The project is still in the design stage and is expected to be completed within 16 months after groundbreaking under a turnkey, fixed price Engineering Procurement and Construction (“EPC”) contract. The EPC contractor is yet to be selected while construction activities are expected to commence in Q1 2023. The plant is anticipated to be operational for 20 years and then handed over to the Government of Tunisia The proposed project site is located in the Kairouan Governorate in the delegation of Sbikha, around 110km south of Tunis, 15km north of Kairouan and about 500m northeast of the Sbikha Industrial zone. The proposed plant will be built on a 2km2 plot owned by the Government and leased to the company. The site is uninhabited and is part of the larger Metbasta desert rangeland area. The closest identified residential areas are the villages of Al Metbasta and Al Bshashma, located approximately 2.2km to the south and 4km to the northeast respectively. The plant will consist of a utility grade grid-connected PV array power system, carried on a horizontal single-axis beam tracker, consisting of approximately 220 thousand, bifacial crystalline PV panels with anti-reflective coating. Preliminary design indicates that the plant will include string inverters stations, converting direct current from the panels to alternating current, and a substation, converting to appropriate voltage for connection directly to the national grid with no storage batteries required. Connection to the grid will be through an 8km, high voltage 225 kilovolt OverHead Transmission Line (“OHTL”) constructed and operated by the Société Tunisienne de l'Electricité et du Gaz (Tunisian Company of Electricity and Gas – “STEG”). The plant will also include ancillary structures like office and data control building, warehouses and workshops, and internal roads; the plant will be completely fenced. Access to the site is via the existing regional road 171 running north-south about along the site east boundary. The project is expected to employ approximately 450 (peak) workers during the construction stage, of which 100 would be skilled and 350 unskilled, during the construction phase. During the Operation and Maintenance (“O&M”) phase, to be carried out by a specialized contractor under KSP supervision, 45 workers, 10 skilled and 35 unskilled, are expected to be involved on site working in shifts. The E&S policies and procedures at the level of the Project Company will reflect those of AMEA. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |