Kakabeka Falls Generating Station Redevelopment
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Complete overhaul of the 118-year-old Kakabeka Falls hydro-electric generating station, including construction of an extension to the existing powerhouse, installation of two new turbine-generating units, replacement of four existing units, and replacement of a surge tank and penstocks. The project will increase capacity by 13% and extend the plant's life expectancy by 90 years.
- Status
- Prospective
- Sector
- Hydro, Wind, Power Generation (CCGT), Commercial
- Location
- Kakabeka Falls, Ontario, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Kakabeka Falls Generating Station Redevelopment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Complete overhaul of the 118-year-old Kakabeka Falls hydro-electric generating station, including construction of an extension to the existing powerhouse, installation of two new turbine-generating units, replacement of four existing units, and replacement of a surge tank and penstocks. The project will increase capacity by 13% and extend the plant's life expectancy by 90 years. |
Budget |
Location
Country | Canada |
State | Ontario |
City | Kakabeka Falls |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Hydro, Wind, Power Generation (CCGT), Commercial |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
