Kakheti Connectivity Improvement Project
Sector: Road • Location: Georgia
Source: World Bank Group
The project aims to (a) improve the connectivity and integration between a leading region (Tbilisi) and a relatively lagging one (Kakheti) - through modern highway infrastructure conceptualized as a corridor that will eventually be extended to an alternative Georgia-Azerbaijan border crossing point and thus with long-term implications for cross-border trade, regional integration, network operation
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project aims to (a) improve the connectivity and integration between a leading region (Tbilisi) and a relatively lagging one (Kakheti) - through modern highway infrastructure conceptualized as a corridor that will eventually be extended to an alternative Georgia-Azerbaijan border crossing point and thus with long-term implications for cross-border trade, regional integration, network operational resilience, tourism, and growth; (b) support primary sector economic activity in Kakheti through better access to markets in Tbilisi and beyond, thus contributing to higher-quality products that can better compete domestically and internationally, with the potential to increase employment and incomes for underserved groups, including women, young people, and minority groups; and (c) elevate the standard of national-level highway infrastructure. The project comprises three components: Component 1. Connectivity Improvements on the Eastern Corridor will support the construction of a 17 km long Sagarejo-Badiauri section (Lot 3 out of 5 along the proposed Tbilisi-Sagarejo-Bakurtsikhe corridor). Component 2. Improvements to Local Marketplace will provide safe trading premises for roadside vendors in proximity to Badiauri interchange of the highway. Component 3. Institutional Strengthening and Implementation Support will finance technical assistance to the Roads Department (RD) and incremental operating cost of project implementation. The project will contribute specifically to focus area 1 (Enhance Inclusive Growth and Competitiveness) in the CPF as it aims at increasing economic participation through (a) improving connectivity and integration by continuing to develop selected infrastructure and improving the flow of goods and people along key corridors and crossing points, and (b) contributing to a more diversified rural economy with the potential to increase employment and incomes for underserved groups, such as women, young people and minority groups. By championing engineering designs and infrastructure construction methods that are resilient to extreme weather events and other climate risks as well as aligned with European best practices and standards, the project will also contribute to focus area 3 (Building Resilience). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
