logo

Kakinada Regas Project [by Shell]

Sector: Energy Storage • Location: Andhra Pradesh, India

Source: India Investment Grid (IIG)

Project
Closed

Economic/Social Impact of the Project Shell through its wholly owned subsidiary Andhra LNG Pvt Ltd is developing an LNG regasification terminal to supply Andhra Pradesh with regasified LNG. The terminal is being developed under the GOI policy permitting 100percentage FDI [automatic route] and is State of the art, latest generation, floating regasification storage unit [FSRU] with up to 5 mtpa capa

Project Information FAQ

Project Information

5 Q
The project “Kakinada Regas Project [by Shell]” is an infrastructure initiative in the Energy Storage sector, located in Andhra Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Economic/Social Impact of the Project Shell through its wholly owned subsidiary Andhra LNG Pvt Ltd is developing an LNG regasification terminal to supply Andhra Pradesh with regasified LNG. The terminal is being developed under the GOI policy permitting 100percentage FDI [automatic route] and is State of the art, latest generation, floating regasification storage unit [FSRU] with up to 5 mtpa capacity using the most efficient and environmentally friendly regasification process. The project will provide earliest relief to 4,000 MW gas based power plants that are now distressed. It requires no project financing thus saving significant time. It entails FDI of approximately USD 800 mln for FSRU and installations. The engineering and design for all elements of the project is completed, and the FSRU has been selected. A full scale Environmental Impact Assessment [EIA] was submitted to the state Pollution Control Board on 28th March 2013 demonstrating only minimal environmental impact. Several gas sales heads of agreements signed wit

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data