logo

Kakono hydroelectric power plant

Sector: Hydro • Location: France

Source: Proparco Groupe AFD (Agence Française de Développement)

Project
Ongoing

The project is in line with the National Energy Policy (2015) specific objectives of enhancing power reliability and coverage of transmission and distribution networks, increasing use of renewable energy in the generation mix, and accelerating rural electrification to foster socio-economic transformation. The project is a priority of the Power System Master Plan updated in 2020. The main objective

Project Information FAQ

Project Information

4 Q
The project “Kakono hydroelectric power plant” is an infrastructure initiative in the Hydro sector, located in France. Taiyo aggregates data on it from Proparco Groupe AFD (Agence Française de Développement).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is in line with the National Energy Policy (2015) specific objectives of enhancing power reliability and coverage of transmission and distribution networks, increasing use of renewable energy in the generation mix, and accelerating rural electrification to foster socio-economic transformation. The project is a priority of the Power System Master Plan updated in 2020. The main objective is to strengthen a low-carbon economic growth in Eastern Africa by supporting the development of renewable energy, cross-border linkage and regional stability of the grid, in Kagera region but also in the neighboring regions in Tanzania and Uganda.The specific objectives of the project are to: increase installed renewable power capacity in northwestern regions of Tanzania,support efficient, sustainable and resilient power production,improve power network redundancy and interconnectivity,strengthen institutional capacity in Tanzania for hydropower management. 

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data