Kakrapar Nuclear Power Plant
Sector: Power Generation (CCGT) • Location: India
Source: The Global Energy Association
The fourth power unit of the Kakrapar Nuclear Power Plant in India was connected to the grid in February 2024. This project has been under construction since November 2010, reflecting the long timelines often associated with nuclear power projects.
- Status
- Closed
- Sector
- Power Generation (CCGT), Nuclear
- Location
- India
- Updated
- 22 Jul 2026
- Source
- The Global Energy Association
ConstructChat
Ask ConstructChat about Kakrapar Nuclear Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The fourth power unit of the Kakrapar Nuclear Power Plant in India was connected to the grid in February 2024. This project has been under construction since November 2010, reflecting the long timelines often associated with nuclear power projects. |
Original sector | Energy |
Location
Country | India |
Source
Source | The Global Energy Association |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Nuclear |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
