KALA Offices / Sujets Objets
The status, timeline and source of this project. A free account opens every field.
Source: ArchDaily
The additional floor of 800m2contains workshops, classrooms and offices. It adopts a simple, orthogonal and free plan, whose specificity lies in the alteration of the existing structural rhythm. In doing so, the new floor plan frees itself from corridors, and offers a generous and continuous living space.A sculptural staircase is installed in the full-height void which marks the main access to the
- Status
- Closed
- Sector
- Education, Metal, Manufacturing (Industrial), Residential, Commercial
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about KALA Offices / Sujets Objets
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The additional floor of 800m2contains workshops, classrooms and offices. It adopts a simple, orthogonal and free plan, whose specificity lies in the alteration of the existing structural rhythm. In doing so, the new floor plan frees itself from corridors, and offers a generous and continuous living space.A sculptural staircase is installed in the full-height void which marks the main access to the building. The technical elements cross the space freely, sometimes imposing their proper logic to the whole. A disgorger is carefully located on the east façade. A column intended to take up the loads of the metal frame in case of fire, remains floating.The additional floor has the ambition to be read both in the continuity of the existing building, and as an independent volume. A box, within which lies a series of exceptions, specificities, fireworks.The extension is organized under a large metallic frame which gives rhythm to the interiors. The project is defined by a perimeter, a simple limit that draws generic, efficient and flexible spaces. The rationality of the project is altered by precise moments where a few controlled irregularities are to be found.Text description provided by the architects.In a context characterized by transformed or entirely replaced industrial buildings, the project preserves and extends by one floor the existing building of HEAD-Geneva (School of Arts and Design), built by architect Jean Erb in 1948 and classified as heritage of the 20thcentury. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Education, Metal, Manufacturing (Industrial), Residential, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Education projects
- IRKUTSK SMART SCHOOL
- Maintenance and operations funding
- Chemical sciences modernization
- University of Alberta - Central Academic Building Lower-Level Renewal
- Brock University's Marilyn I. Walker School of Fine and Performing Arts
- McMath Secondary School
- Osgoode Hall Law School
- Kinnear Centre for Creativity and Innovation
