Kalai-II Hydro Electric Project [1200 MW]
Sector: Power Generation (CCGT) • Location: Anjaw, Arunachal Pradesh, India
Source: India Investment Grid (IIG)
Information THDC India Limited has come up with Kalai-II Hydro Electric Project [1200 MW] with a ticket size of 14105.83 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The Kalai-II Hydroelectric Project [HEP] is located in Hawai,
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | notice to proceed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information THDC India Limited has come up with Kalai-II Hydro Electric Project [1200 MW] with a ticket size of 14105.83 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The Kalai-II Hydroelectric Project [HEP] is located in Hawai, Anjaw District, Arunachal Pradesh. The project site is approximately 325 km from Tinsukia, the nearest railway station, and 362 km from Dibrugarh, the nearest airport. The Project is a run-of-river scheme with pondage involving construction of 198 m high Concrete Gravity Dam on the Lohit River, a tributary of the Brahmaputra. The installed capacity of Project is 1200 MW comprising of 06 generating units of 190 MW each and 1 Unit of 60 MW. The annual energy generation from the project is 4852.95 MUs with an average peaking of more than 3 hours during lean season [Nov-Mar]. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
