logo
ProjectClosed

Kalama NE Downtown Sewer Replacement

One of 10,000+ projects Taiyo tracks in Washington.

Source: Dodge

A. SCHEDULE A: BASIN 7 1. Furnish and install 1,950 LF of 8 PVC and DI sewer main on N 3rd Street, Fir Street, N 3rd Place, and Taylor Road. 2. Furnish and install 32 side sewers. 3. Furnish and install 775 LF of 8 PVC water main, fire hydrant, and 12 water services on N 3rd Street. 4. Concrete curbs, sidewalks, walkways, curb ramps, steps, walls, and driveways repair. 5. HMA repair SCHEDULE B: BA

Status
Closed
Sector
Water Supply and Storage, Commercial, Waste Processing and Treatment, Car parking, Road, Government, Cement, Automotive
Location
Kalama, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Kalama NE Downtown Sewer Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kalama NE Downtown Sewer Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Kalama, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A. SCHEDULE A: BASIN 7 1. Furnish and install 1,950 LF of 8 PVC and DI sewer main on N 3rd Street, Fir Street, N 3rd Place, and Taylor Road. 2. Furnish and install 32 side sewers. 3. Furnish and install 775 LF of 8 PVC water main, fire hydrant, and 12 water services on N 3rd Street. 4. Concrete curbs, sidewalks, walkways, curb ramps, steps, walls, and driveways repair. 5. HMA repair SCHEDULE B: BASIN 8 1. Furnish and install 600 LF of 8 HDPE sewer main on Fir Street via pipe bursting. 2. Furn...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Kalama

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Waste Processing and Treatment, Car parking, Road, Government, Cement, Automotive

Article published date

2025-02-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project