KALASA NALA DIVERSION SCHEME [LIFT SCHEME]
Sector: Hydro • Location: Khanapur, Karnataka, India
Source: India Investment Grid (IIG)
Information Karnataka Neeravari Nigama Limited has come up with KALASA NALA DIVERSION SCHEME [LIFT SCHEME] with a ticket size of 415.08 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Tender Publish and is being developed through the EPC route. Economic/Social Impact of the Project Survey, Investigation, Design, Supply, Errection, Testing and Commis
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | tender publish |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Karnataka Neeravari Nigama Limited has come up with KALASA NALA DIVERSION SCHEME [LIFT SCHEME] with a ticket size of 415.08 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Tender Publish and is being developed through the EPC route. Economic/Social Impact of the Project Survey, Investigation, Design, Supply, Errection, Testing and Commissioning for [1] Construction of Diversion Dam across KalasaNala, Jack Well Cum Pump house on the Foreshore. Rising Main [MS Pipe] from Jack well to Kalasa Inter-Connecting Canal along with Design Supply Installation, Testing and Commissioning of Pumping Machineries with 11 KV motors, 110KV/11KV Sub Station, 110KV power transmission line [OHT/UG Cable]. [2] Construction of Diversion Dam across HaltaraNala, Jack Well cum Pump house on the Foreshore, Rising Main [MS Pipe] from Jack well to Kalasa Dam along with Design, Supply, Installation, Testing and Commissioning of Pumping Machineries, 11KV/6.6KV Sub Station, 11KV transmission line [UG Cable]. [3] Construction of 8 Nos. of Diversion Weirs across Tributaries of SurlaNala, Gravity Main [MS Pipe] Linking all the Weirs and Leading to Collection Sump [Receiving Chamber], Jack well Cum Pump House including Rising Main [MS Pipe] from Sump to Kalasa Dam along with Design, Supply, Installation, Testing and Commissioning of Pumping Machineries, 11KV/0.433KV Sub Station, 11KV transmission line [UG Cable] Etc., Complete and other civil works of cut and cover portion, Supply of Spare Parts, Tools including Requisite Man Power O&M of the System for Five Years from the Date of Completion on Turn Key Basis. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
