logo

Kalgoorlie Consolidated Gold Mines Hybrid Renewable Energy Project

The owner, status and timeline of this project. A free account opens every field.

Source: Energy-Storage.News

Project
Planned

A hybrid renewable energy project featuring 138MW solar PV, 256MW wind capacity, and a 138MW/300MWh battery energy storage system to supply power to Northern Star's Kalgoorlie Consolidated Gold Mines in Western Australia. The project includes a 25-year PPA and a joint venture for 120MW thermal generation and transmission infrastructure.

Status
Prospective
Sector
Geothermal, Solar, Wind, Energy Storage, Power Generation (CCGT), Warehouse
Location
Kalgoorlie-Boulder, Western Australia, Australia
Updated
22 Jul 2026
Source
Energy-Storage.News

ConstructChat

Ask ConstructChat about Kalgoorlie Consolidated Gold Mines Hybrid Renewable Energy Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Kalgoorlie Consolidated Gold Mines Hybrid Renewable Energy Project” is an infrastructure initiative in the Geothermal sector, located in Kalgoorlie-Boulder, Western Australia, Australia. Taiyo aggregates data on it from Energy-Storage.News.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A hybrid renewable energy project featuring 138MW solar PV, 256MW wind capacity, and a 138MW/300MWh battery energy storage system to supply power to Northern Star's Kalgoorlie Consolidated Gold Mines in Western Australia. The project includes a 25-year PPA and a joint venture for 120MW thermal generation and transmission infrastructure.

Original sector

Energy

Location

Country

Australia

State

Western Australia

City

Kalgoorlie-Boulder

Source

Source

Energy-Storage.News

URL

More Details

Record type

Project

Sector

Geothermal, Solar, Wind, Energy Storage, Power Generation (CCGT), Warehouse

Article published date

2025-12-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project