KalSel Coal-Fired Power Plant
Sector: Commercial • Location: Indonesia
Source: World Bank Group
The project envisages the development and construction of a 2 x 100 MW coal-fired power plant in South Kalimantan, Island of Borneo.
Tanjung Power Indonesia ("project company") will undertake the project under a 25-year BOOT contract. PLN is the sole offtaker for the plants' electricity under a 25-year PPA with PLN’s payment obligations being guaranteed by the Indonesian government under its Fast
- Status
- Prospective
- Sector
- Commercial, Bridge, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KalSel Coal-Fired Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project envisages the development and construction of a 2 x 100 MW coal-fired power plant in South Kalimantan, Island of Borneo. Tanjung Power Indonesia ("project company") will undertake the project under a 25-year BOOT contract. PLN is the sole offtaker for the plants' electricity under a 25-year PPA with PLN’s payment obligations being guaranteed by the Indonesian government under its Fast Track II/BVGL scheme. Adaro Energy owns a 65% stake in project company while Korea East-West Power (Kowepo) owns the remaining 35% through its subsidiary, EWP Indonesia. Total investment is estimated at $558 million and is being funded by 75:25 debt to equity. The 20-year $422 million senior loan priced at 155bp over Libor, with a gradual step up to 180bp. The loan is split into a $401 million tranche insured by Korea Trade Insurance Corporation (K-Sure) and a $21 million uncovered tranche provided by Korea Development Bank (KDB). KDB plus five commercial banks are lending under the K-Sure guaranteed facility. The five banks are: MUFG, DBS, HSBC, Mizuho and SMBC. The commercial banks, except HSBC, are also providing an equity bridge loan, which is being guaranteed by the sponsors. In addition, the sponsors are also providing share capital, which is required under Indonesian law. Total equity amount is $136 million. Financial closure occurred on January 18, 2017. https://ijglobal.com/data/transaction/32622/kalsel-coal-fired-power-plant-200mw-ipp |
Original sector | Energy |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2024-06-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
