Kambar-Ata HPP-1 Hydropower Project
Sector: Power Generation (CCGT) • Location: Kyrgyzstan
Source: Akchabar
The Kambar-Ata HPP-1 project is a hydropower plant project in Kyrgyzstan with a planned capacity of 1,860 MW, making it the largest hydropower facility in the country. The project aims to strengthen energy security, meet domestic electricity demand, and expand export potential. The preparatory phase is nearly complete, and financing arrangements have been finalized with the World Bank. Constructio
- Status
- Prospective
- Sector
- Power Generation (CCGT), Hydro
- Location
- Kyrgyzstan
- Updated
- 22 Jul 2026
- Source
- Akchabar
ConstructChat
Ask ConstructChat about Kambar-Ata HPP-1 Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Kambar-Ata HPP-1 project is a hydropower plant project in Kyrgyzstan with a planned capacity of 1,860 MW, making it the largest hydropower facility in the country. The project aims to strengthen energy security, meet domestic electricity demand, and expand export potential. The preparatory phase is nearly complete, and financing arrangements have been finalized with the World Bank. Construction will begin with the excavation of two 800-meter tunnels, followed by the dam and main hydraulic structures. |
Original sector | Energy |
Location
Country | Kyrgyzstan |
Source
Source | Akchabar |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro |
Article published date | 2026-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Kyrgyzstan
- TAJIK - KYRGYZ POWER INTERCONNECTION
- Datka-Kemin (Chuy) Transmission Line
- Toktogul Rehabilitation Project Phase 2
- Toktogul Rehabilitation Project Phase 3
- Bishkek Thermal Power Plant Modernization
- Datca-Kemin (Chuy) Transmission Line
- Kyrgyzstan: Kyrgyz Emergency Support for Private and Financial Sector Project
- Kyrgyzstan: Kyrgyz Emergency Support for Private and Financial Sector Project
