Kambaratin Hydroelectric Power Station-1
Sector: Power Generation (CCGT) • Location: Kyrgyzstan
Source: open.kg
The Kambaratin Hydroelectric Power Station-1 is a hydroelectric power project in Kyrgyzstan with a planned capacity of 1860 megawatts. The project aims to enhance the energy resilience of the region, strengthen Kyrgyzstan's energy independence, and expand export opportunities. The first stage of construction includes laying two 800-meter tunnels, followed by the construction of the dam and other m
- Status
- Prospective
- Sector
- Power Generation (CCGT), Hydro
- Location
- Kyrgyzstan
- Updated
- 22 Jul 2026
- Source
- open.kg
ConstructChat
Ask ConstructChat about Kambaratin Hydroelectric Power Station-1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Kambaratin Hydroelectric Power Station-1 is a hydroelectric power project in Kyrgyzstan with a planned capacity of 1860 megawatts. The project aims to enhance the energy resilience of the region, strengthen Kyrgyzstan's energy independence, and expand export opportunities. The first stage of construction includes laying two 800-meter tunnels, followed by the construction of the dam and other main structures. The feasibility study has been completed, and preparatory stages are expected to be completed by April 2026. |
Original sector | Energy |
Location
Country | Kyrgyzstan |
Source
Source | open.kg |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro |
Article published date | 2026-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Kyrgyzstan
- TAJIK - KYRGYZ POWER INTERCONNECTION
- Datka-Kemin (Chuy) Transmission Line
- Toktogul Rehabilitation Project Phase 2
- Toktogul Rehabilitation Project Phase 3
- Bishkek Thermal Power Plant Modernization
- Datca-Kemin (Chuy) Transmission Line
- Kyrgyzstan: Kyrgyz Emergency Support for Private and Financial Sector Project
- Kyrgyzstan: Kyrgyz Emergency Support for Private and Financial Sector Project
