Kamloops - Tranquille Sanitary Sewer Upgrade Phase 3
Sector: Waste Processing and Treatment • Location: British Columbia, Canada
Source: Infrastructure Canada
This project will increase capacity to manage wastewater by replacing a section of aging asbestos cement sanitary sewer main with PVC pipe; provide services to the community which are not yet connected to the system and increase capacity to accommodate future growth. The project works include: - Installation of approximately 2 km of sanitary sewer main; - Decommissioning of existing sanitary sewe
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Kamloops - Tranquille Sanitary Sewer Upgrade Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will increase capacity to manage wastewater by replacing a section of aging asbestos cement sanitary sewer main with PVC pipe; provide services to the community which are not yet connected to the system and increase capacity to accommodate future growth. The project works include: - Installation of approximately 2 km of sanitary sewer main; - Decommissioning of existing sanitary sewer main; - Installation of approx.15 new manholes and approx. 90 service connections; - Installation of approximately 320m of drinking water main; - Installation of approx. 12 new water service connections and 6 hydrants; - Installation of approx. 2.6 km of stormwater swales and pipes; - Installation of approx. 52 rockpits and 4 catchbasins; - Relocation of other utilities, as required; and, - Backfill, rehabilitation of surface infrastructure and related site works. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
