logo
ProjectProject In Tender

Kampala Bus Rapid Transit System Consultancy Project

One of 68 projects Taiyo tracks in Kampala.

Source: InfraPPPWorld

The project involves reviewing and updating the detailed designs for the Bus Rapid Transit (BRT) system in the Greater Kampala Metropolitan Area in Uganda.The main objective of the project is to review and update the detailed designs for the BRT system that were prepared in 2014 to reflect current and expected travel needs in the Greater Kampala Metropolitan Area (GKMA). The 42 km BRT scheme is se

Status
Under Construction
Sector
Car parking, Road, Government, Automotive
Location
Kampala, Uganda
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Kampala Bus Rapid Transit System Consultancy Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kampala Bus Rapid Transit System Consultancy Project” is an infrastructure initiative in the Car parking sector, located in Kampala, Uganda. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Status

Original status

project in tender

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves reviewing and updating the detailed designs for the Bus Rapid Transit (BRT) system in the Greater Kampala Metropolitan Area in Uganda.The main objective of the project is to review and update the detailed designs for the BRT system that were prepared in 2014 to reflect current and expected travel needs in the Greater Kampala Metropolitan Area (GKMA). The 42 km BRT scheme is set to be implemented in phases:Phase 1 will run along the Kalerwe (Bwaise) to Kibuye corridor, with a link to Banda along Jinja Road;Phase 2 will run from Banda to Mukono;Phase 3 will span the Kibuye-Kajjansi corridor; andPhase 4 will run along the Kalerwe to Kasangati (Gayaza) corridor.The proposed design includes the construction of:Exclusive BRT lanes spanning 3.5 m, each located in the center or side of the road. The lanes are expected to fit within the available space;26 stations with side platforms (40x5m) to fit within the available space;Three terminals spanning 3 ha each;One depot spanning 4 ha;Bicycle parking facilities on stations and terminals; andTraffic signaling on all key junctions.The project also includes the provision of 18 m long articulated low-floor buses that can travel at 22 km an hour and carry up to 150 passengers.

Original sector

Transport

Budget

Location

Country

Uganda

State

Kampala

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Car parking, Road, Government, Automotive

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project