logo

Kampala Bus Rapid Transit System Consultancy Project

Sector: Car parking • Location: Uganda

Source: InfraPPPWorld

Project
Project In Tender

The project involves reviewing and updating the detailed designs for the Bus Rapid Transit (BRT) system in the Greater Kampala Metropolitan Area in Uganda. The main objective of the project is to review and update the detailed designs for the BRT system that were prepared in 2014 to reflect current and expected travel needs in the Greater Kampala Metropolitan Area (GKMA). The 42 km BRT scheme is s

Project Information FAQ

Project Information

5 Q
The project “Kampala Bus Rapid Transit System Consultancy Project” is an infrastructure initiative in the Car parking sector, located in Uganda. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in tender

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves reviewing and updating the detailed designs for the Bus Rapid Transit (BRT) system in the Greater Kampala Metropolitan Area in Uganda. The main objective of the project is to review and update the detailed designs for the BRT system that were prepared in 2014 to reflect current and expected travel needs in the Greater Kampala Metropolitan Area (GKMA). The 42 km BRT scheme is set to be implemented in phases: Phase 1 will run along the Kalerwe (Bwaise) to Kibuye corridor, with a link to Banda along Jinja Road; Phase 2 will run from Banda to Mukono; Phase 3 will span the Kibuye-Kajjansi corridor; and Phase 4 will run along the Kalerwe to Kasangati (Gayaza) corridor. The proposed design includes the construction of: Exclusive BRT lanes spanning 3.5 m, each located in the center or side of the road. The lanes are expected to fit within the available space; 26 stations with side platforms (40x5m) to fit within the available space; Three terminals spanning 3 ha each; One depot spanning 4 ha; Bicycle parking facilities on stations and terminals; and Traffic signaling on all key junctions. The project also includes the provision of 18 m long articulated low-floor buses that can travel at 22 km an hour and carry up to 150 passengers.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data