logo

Kanci-Pejagan Toll Road

Sector: Road • Location: Indonesia

Source: World Bank Group

Project
Active

In 1997, the Ministry of Public Works awarded the Kanci-Pejagan Toll Road to the consortium of PT Bakrie to build a 54km highway connecting Kanci and Pejagan in West Java. The highway was slated to connect to the existing Palimanan-Kanci Toll Road as part of the 1500 km trans java toll road network. 80% of the shares in the project company were held by PT Bakrie Investindo. Other shareholders in

Status
Prospective
Sector
Road, Government, Manufacturing (Industrial), Commercial
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kanci-Pejagan Toll Road

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kanci-Pejagan Toll Road” is an infrastructure initiative in the Road sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In 1997, the Ministry of Public Works awarded the Kanci-Pejagan Toll Road to the consortium of PT Bakrie to build a 54km highway connecting Kanci and Pejagan in West Java. The highway was slated to connect to the existing Palimanan-Kanci Toll Road as part of the 1500 km trans java toll road network. 80% of the shares in the project company were held by PT Bakrie Investindo. Other shareholders included the private Indonesian firm PT Arthayasa Karya Bina Caraka with 12-percent and the Indonesian state-owned road-construction and –operation company, PT Jasa Marga with eight-percent. The Kanci-Pejagan Toll Road was originally awarded through direct negotiation in 1997, but it was delayed due the economic crisis by Presidential Decree no 39 of 1997. Presidential Decree no 15 of 2002 revoked Presidential Decree no 39 of 1997, and allowed the resumption of the projects if deemed necessary by the President. In December 2005, thirteen toll road projects including the Kanci-Pejagan were re-evaluated by the federal government. The project reached financial closure in March 2007 with a syndication given by Bank Negara Indonesia Tbk (BNI) and Bank Rakyat Indonesia (BRI). PT Semesta Marga Raya (SMR) worth Rp. 1.389 trillion ($US 151.2 million). BNI was the syndication leader, with 65% of the total credit or IRp. 897.6 billion, (US $98.2 million) while the remaining 35% was covered by BRI. President Director of BNI, Sigit Pramono, stated that the effective interest rate is 14% during construction, reaching a value worth Rp. 139 billion with a grace period up to 3 (three) years. The Kanji-PejaganToll Road project was estimated to cost approximately Rp. 2.09 trillion, (US $228.6 million). The road was inaugurated on January 26, 2010.

Original sector

Transport

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Government, Manufacturing (Industrial), Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project