Kannur Vengalem NH17 Road

Sector: Commercial • Location: India

Source: World Bank Group

Project
Cancelled

On 20th July 2009, National Highway Authority of India (NHAI) awarded a 23-year concession (including construction period of 910 days) to KMC Constructions Limited, for the strengthening, improvement,4-laning,operation and maintenance, and tolling of 81.5kms of Kannur-Vengalem section from KM230.000 to KM318.000 of National Highway 17, in the state of Kerala.

Under the contract, KMC was respon

Status
Failure
Sector
Commercial, Road, Waste Processing and Treatment, Bridge, Government
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kannur Vengalem NH17 Road

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kannur Vengalem NH17 Road” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Cancelled

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On 20th July 2009, National Highway Authority of India (NHAI) awarded a 23-year concession (including construction period of 910 days) to KMC Constructions Limited, for the strengthening, improvement,4-laning,operation and maintenance, and tolling of 81.5kms of Kannur-Vengalem section from KM230.000 to KM318.000 of National Highway 17, in the state of Kerala. Under the contract, KMC was responsible for the design,construction,finance, operation and maintenance,strengthening and widening the existing 2-lane carriageway to 4-lane divided carriageway.The scope included construction of new pavement,rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges,culverts, road intersections,interchanges, drains, etc.The expansion project, part of the National Highway Development Program (NHDP-IIIB), was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. KMC won the tender through international competitive bidding, conducted by NHAI, by requesting the lowest grant of US$ 113.8mn (INR 5202mn @45.72 INR/USD).Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling, during the term of concession. The concession agreement was signed on 24th February 2010. The project didnot close financing at the time of cancellation. The estimated capital cost of the project at the time of bidding was US$ 286.9mn (INR 13120mn @45.72INR/USD). The project was expected to start construction by May 2010. However, even after a lapse of three-and-a-half years, the requisite land/right of way (ROW) could not be made available by NHAI. For the Kannur-Vengalam section, only 34 per cent of land, that too of the existing ROW, was available. Finally NHAI canceled the concession in November 2013.

Original sector

Transport

Procurement method

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Road, Waste Processing and Treatment, Bridge, Government

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project