Kanupur Irrigation Project
Sector: Hydro • Location: joda, Odisha, India
Source: India Investment Grid (IIG)
Information Water Resources-OR has come up with Kanupur Irrigation Project with a ticket size of 2301.28 INR Crores. This project in Irrigation sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project The Kanupur Irrigation Project is a major Irrigation Project across River Baitarani near village Basudevpur, in
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Water Resources-OR has come up with Kanupur Irrigation Project with a ticket size of 2301.28 INR Crores. This project in Irrigation sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project The Kanupur Irrigation Project is a major Irrigation Project across River Baitarani near village Basudevpur, in Champua Sub-division of Keonjhar District. The Project envisages construction of Earth Dam across River Baitarani at confluence point of River Baitarani with Sona Nalla [Kandara Nalla] with total CCA of 29,578 ha and ultimate irrigation of 47,709 ha. The Project envisages construction of following components- ? 3.460 km long and 39.5m high Earth Dam across River Baitarani at D/S of confluence point of River Baitarani with Sona Nalla [Kandara Nalla] with Gross Storage capacity 331.02 MCM ? 213m long centrally located Ogee type gated Spillway with design flood capacity of 14,450cumec. ? 12 no. Radial Gates of each size 15mX12m. ? 280m long dyke on Left flank. ? 1 no. of Head Regulator [Right side of the River] with SHEP [Small Hydro Electrical Project] Head discharge of 35.05cumec for Canal &- 9.9cumec for SHEP. ? The proposed &- under construction SHEP is with Steel Liner of 72m length &- 3.5m dia. with provision for generating 4.92MW Electricity. ? The Head Regulator is four vented with 4 nos. of Emergency Gates &- 4 nos. of Service Gates &- that of SHEP is with 1 Emergency Gate &- 1 Service Gate. ? 78.21km long Unlined Right Canal &- 906km long Distribution System up to 5 ha blocks. ? Provision of 10MCM of water kept for Drinking Water needs without affecting required Irrigation. ? Nos. of Village affected- 16 [10 nos. Fully Submerged &- 6 nos. Partially Submerged with ? nos. of Families as per Base Line Survey -2006]. ? Total Forest Land Diversion-235.269 ha. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
