Kapamba Mini Hydro Power Project

Sector: Government • Location: Mpika, Zambia

Source: United Nations Industrial Development Organization (UNIDO)

Project

Atlantic Commodities Limited (ACL) a company established in 2009 has the objective to develop a 12MW small hydropower station with all its associated appurtenant. ACL was granted permission to develop this project by the Ministry of Energy in 2018, following the 2012 prefeasibility study conducted by the Government through ZESCO in collaboration with UNIDO’s International Centre for Small Hydropow

Project Information FAQ

Project Information

4 Q
The project “Kapamba Mini Hydro Power Project” is an infrastructure initiative in the Government sector, located in Mpika, Zambia. Taiyo aggregates data on it from United Nations Industrial Development Organization (UNIDO).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Atlantic Commodities Limited (ACL) a company established in 2009 has the objective to develop a 12MW small hydropower station with all its associated appurtenant. ACL was granted permission to develop this project by the Ministry of Energy in 2018, following the 2012 prefeasibility study conducted by the Government through ZESCO in collaboration with UNIDO’s International Centre for Small Hydropower (ICHSP) to determine the economic viability of developing a mini hydro power plant at the Kapamba Falls. This project will involve the supply, delivery, installation, testing and commissioning of 3 units (3×4000kW) of the Kapamba Mini Hydropower Project including construction of the powerhouse, canal, dam, forebay, switchyard and supplying mechanical and electrical equipment for the power generation. The power at the station will be generated at 6.3kV and then stepped up to 33kV using a 6.3/33kV 15MVA transformer and then evacuated to the National grid at Mpika Substation via the proposed 66kV steel lattice transmission line. This project will contribute in addressing the increased economic activities witnessed in Zambia in the recent past coupled with government’s ambitious desire to increase the electrification rate in the rural areas from the current 3% to 51% by the year 2030. The project duration in commensurate with ICSHP’s experience on similar projects is approximately three years, including contingency and has a life span of 27 years. This project is profitable with annual incomes of USD 30,730,000 in year one, USD 35,920,000 in year two and 41,460,000 in year three respectively and EIRR of 6% to 10%. The estimated total investment of the project is USD 37,928,351. The project is open to FDI through a majority stake and ACL is seeking for a project financier or equity partner with a 30:70 shareholding structure. The project will be located at 31º 47’ 12” E, 11º 48’ 27” S on the Munyamadzi River in Mpika District of Muchinga Province.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data