Kapex New 8 Inches Waterline
Sector: Water Supply and Storage • Location: Nevada, United States of America
Source: Dodge USA
Construction approximately 2,500 L.F. of 8 inch waterline that will connect the 24 waterline on Kapex Power Parkway to the existing 4 Kapex waterline. This will give backup to the 24 waterline if the Kapex Well is off-line. The City of North Las Vegas may be seeking a consultant to provide design services for the Kapex New 8 Inches Waterline.
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government, Road, Commercial, Waste Processing and Treatment
- Location
- Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Kapex New 8 Inches Waterline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction approximately 2,500 L.F. of 8 inch waterline that will connect the 24 waterline on Kapex Power Parkway to the existing 4 Kapex waterline. This will give backup to the 24 waterline if the Kapex Well is off-line. The City of North Las Vegas may be seeking a consultant to provide design services for the Kapex New 8 Inches Waterline. |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government, Road, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
