Kapkot-Pothing Road Project
One of 2,830 projects Taiyo tracks in Uttarakhand.
Source: The Times of India
Road construction and repair works on the Kapkot-Pothing stretch under the Pradhan Mantri Gram Sadak Yojana (PMGSY) have been stalled due to the strike by diploma engineers. The work was scheduled ahead of the monsoon but all processes are currently halted.
- Status
- Failure
- Sector
- Road
- Location
- Kapkot, Uttarakhand, India
- Updated
- 22 Jul 2026
- Source
- The Times of India
ConstructChat
Ask ConstructChat about Kapkot-Pothing Road Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Road construction and repair works on the Kapkot-Pothing stretch under the Pradhan Mantri Gram Sadak Yojana (PMGSY) have been stalled due to the strike by diploma engineers. The work was scheduled ahead of the monsoon but all processes are currently halted. |
Original sector | Infrastructure |
Location
Country | India |
State | Uttarakhand |
City | Kapkot |
Source
Source | The Times of India |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-04-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
