logo
ProjectClosed

Kaplan Sewer System Improvements Phase 2

One of 10,000+ projects Taiyo tracks in Louisiana.

Source: Dodge

he Work Shall Consist of Providing all Labor, Equipment, Supervision and Materials Required for the Replacement of Approximately 1,000 feet of 8 Concrete Sewer Lines, performing Three Main Line Point Repairs, Constructing a New Trash Basket Structure along with a Trolley Beam and Hoist System for the existing Trahan Avenue Pump Station, and Miscellaneous Associated Work within the Kaplan Sewer Sys

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Cable car, Automotive, Telecommunications, Cement, Government
Location
Kaplan, Louisiana, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Kaplan Sewer System Improvements Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kaplan Sewer System Improvements Phase 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Kaplan, Louisiana, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

he Work Shall Consist of Providing all Labor, Equipment, Supervision and Materials Required for the Replacement of Approximately 1,000 feet of 8 Concrete Sewer Lines, performing Three Main Line Point Repairs, Constructing a New Trash Basket Structure along with a Trolley Beam and Hoist System for the existing Trahan Avenue Pump Station, and Miscellaneous Associated Work within the Kaplan Sewer System.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Louisiana

City

Kaplan

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Cable car, Automotive, Telecommunications, Cement, Government

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project