logo

Karaca Hydro

Sector: Water Supply and Storage • Location: Turkiye

Source: International Finance Corporation (IFC)

Project
Active

Kremna Elektrik Uretim A.S. (“Kremna”, or the “company”), a special-purpose vehicle incorporated in Turkey and owned by Gama Enerji Anonim Sirketi (“Gama” or the “sponsor”), is acquiring operational rights of the electricity generation assets of Karacaören I and Karacaören II hydropower projects on the Aksu River in southwestern Turkey, about 100 kilometers north of Antalya (the “project”). Gama w

Project Information FAQ

Project Information

4 Q
The project “Karaca Hydro” is an infrastructure initiative in the Water Supply and Storage sector, located in Turkiye. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Kremna Elektrik Uretim A.S. (“Kremna”, or the “company”), a special-purpose vehicle incorporated in Turkey and owned by Gama Enerji Anonim Sirketi (“Gama” or the “sponsor”), is acquiring operational rights of the electricity generation assets of Karacaören I and Karacaören II hydropower projects on the Aksu River in southwestern Turkey, about 100 kilometers north of Antalya (the “project”). Gama was the winning bidder at a privatization tender held in November 2015 for the two projects, which have a total generation capacity of 78.4 megawatts (MW), 32MW for Karacaören I and 46.4MW for Karacaören II. Gama is a Turkish company active in the water and power sectors in Turkey and the Middle East since the early 2000s. Gama currently has 303.5MW in operational installed capacity, of which renewables contribute 26 percent. IFC and the IFC Asset Management Company’s Global Infrastructure Fund, have a 27 percent equity stake in Gama (project #32258 disclosed on September 15, 2014). Gama has now approached IFC for a $47 million A-loan for the Karacaören project. Karacaören I and II are currently owned and operated by the Turkish Electricity Generation Corporation (EÜAŞ). The acquisition and project turnover are expected to be complete by mid- to late 2016, with generation to continue without interruption. The acquisition will include the intakes, powerhouses, and tailraces of both Karacaören I and II. The acquisition also will include about 100-200 meters of access roads that lead from public roads to the powerhouses. Water flows for power generation will continue to be dispatched by the General Directorate of State Hydraulic Works (DSI). DSI will retain control and ownership of the dams and reservoirs, spillways and floodgates, although the company will be responsible for operating the gates under DSI direction if necessary. The Karacaören I dam is a clay-core earthfill structure 93 meters high. The dam impounds a reservoir of about 45.5 square kilometers. The reservoir holds up to about 1.2 billion cubic meters of water, enough for about six months’ electricity generation. A number of holiday homes and resorts are on the shores, and it supports many floating fish farms. As noted, neither the dam nor the reservoir are part of the acquisition. The intake, which is part of the acquisition, is separate from and south of the dam; water flows 468 meters through a tunnel to a surge tank and penstock, thence 207 meters to the powerhouse, which lies at the downstream toe of the dam. The powerhouse holds two 16MW JM Voith turbines, which since 2002 have operated at 37.1 percent capacity to generate an average of 104.1 gigawatt hour (GWh) per year. Water is discharged through four gates to the rock-armored bed of the Aksu River. Since the dam was completed in 1990, no floodwaters have had to be released through the floodgates and the spillways have not been used. Karacaören I also includes an administration compound several kilometers from the dam and powerhouse. This compound has several office buildings, a primary school attended by 125 local children, several residential buildings, a mosque, and a residence occupied by the local mukhtar (village headman). Apartments in the residential buildings formerly housed EÜAŞ staff and workers, but most are now vacant. A small store on the property serves local residents. The Karacaören II dam is located 10 river kilometers downstream of Karacaören I and is a concrete structure crossed by highway 685. The dam is 52 meters high and impounds a reservoir that holds about 33.8 million cubic meters, enough water to generate electricity for only 24 hours. An intake near the dam passes water into and through a tunnel 4.45 kilometers long to a surge tank and penstock, then 410 meters to the powerhouse. Electricity is generated by two 23.2MW Harbin turbines, which in recent years have operated at 38.3 percent capacity to generate about 155.5 GWh per year. Water is then discharged through four gates into the concrete- and rock-armored channel of the Aksu River, which at the Karacaören II tailrace is the backwater from a small hydropower project about three kilometers downstream. Since the dam was completed in 1993, floodwaters have had to be released through the floodgates and spillways only one time, in 1998. Karacaören II operates only when water is being released from Karacaören I, which is going to be regulated by water usage agreement. Although the Karacaören I reservoir’s capacity would allow peaking generation, power production and releases during farmers’ growing season are going to be regulated according to the water usage agreement.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data