KARACHI PORT MODERN.
Sector: Road • Location: Pakistan
Source: World Bank Group
The principal objectives are to: (a) assist with the development of an appropriate strategy for the medium/long-term development of the port subsector; (b) reduce port costs; (c) strengthen the Karachi Port organization; and (d) expand liquid cargo handling facilities. The project consists of: (a) construction of an oil-terminal to meet medium-term oil needs; (b) construction of an elevated rou
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Bridge, Oil and Gas, Seaport, Government
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KARACHI PORT MODERN.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The principal objectives are to: (a) assist with the development of an appropriate strategy for the medium/long-term development of the port subsector; (b) reduce port costs; (c) strengthen the Karachi Port organization; and (d) expand liquid cargo handling facilities. The project consists of: (a) construction of an oil-terminal to meet medium-term oil needs; (b) construction of an elevated roundabout with a flyover to improve the port's landside access; (c) reconstruction of quayside pavements to enable cargo to be handled with modern equipment; (d) modification to Keamari Groyne Access Road to permit the effective use of the Groyne area; (e) procurement of a bucket dredger to maintain water depths; (f) procurement of equipment to provide marine environmental protection; (g) expanded computerization of the Karachi Port Trust (KPT) to improve port management information systems, communications, and clearance of cargo; (h) procurement of radar to control ship movements and increase the number of ships entering/exiting the port per tide; (i) procurement of consultancy services for the preparation of feasibility studies, tender documents, supervision and other various studies. |
Original sector | FY17 - Public Administration,FY17 - Transportation,Transportation |
Budget |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Bridge, Oil and Gas, Seaport, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
