logo
ProjectClosed

KARACHI POWER IV

Sector: Power Generation (CCGT) • Location: Pakistan

Source: World Bank Group

The project consists of an extension of KESC's generating facilities by the addition of a 125 MW generating unit to the existing Korangi power station, the extension of the existing transmission and distribution system, the purchase of certain construction, maintenance and accounting equipment, and the provision of consulting services. The size of the generating unit to be installed conforms with

Status
Closed
Sector
Power Generation (CCGT), Geothermal, Raw Materials, Government
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about KARACHI POWER IV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “KARACHI POWER IV” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of an extension of KESC's generating facilities by the addition of a 125 MW generating unit to the existing Korangi power station, the extension of the existing transmission and distribution system, the purchase of certain construction, maintenance and accounting equipment, and the provision of consulting services. The size of the generating unit to be installed conforms with the views of the bank's study group as the best means of filling the gap until interconnection with WAPDA becomes economic. The unit would thereafter fit well into the thermal power requirements of the system.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Geothermal, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project