KARACHI POWER
One of 10,000+ projects Taiyo tracks in Pakistan.
Source: World Bank Group
The Karachi Electric Supply Corporation Power Plant Project provides $13.8 million to support improvements in existing steam and diesel stations, the construction of a new 30,000 kw steam station, and substantial additions to the transmission and distribution systems. The project has five components. The first improves the existing steam station by providing replacements and spare parts for boiler
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Geothermal, Commercial, Government, Residential
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KARACHI POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Karachi Electric Supply Corporation Power Plant Project provides $13.8 million to support improvements in existing steam and diesel stations, the construction of a new 30,000 kw steam station, and substantial additions to the transmission and distribution systems. The project has five components. The first improves the existing steam station by providing replacements and spare parts for boilers, heaters, pumps, and electrical equipment. Switchgear required for interconnection with the new steam station will be added. The second component improves the diesel plant. This plant consists of 19 generating sets, only 7 of which are presently usable. Replacements, spare parts, switchgear, machine tools, and new water coolers will be purchased in order to place 9 of the larger units, including those now in operation, in proper condition for continuous service. The third component constructs a new steam station, which will contain two units of 15,000 kw with 3 boilers operating at 400 lb/sq. in. pressure and 775 degrees F. The fourth component constructs transmission and distribution facilities. The fifth component funds office equipment, business machines, scales, furniture, etc. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Geothermal, Commercial, Government, Residential |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
