logo
ProjectClosed

KARACHI POWER

One of 10,000+ projects Taiyo tracks in Pakistan.

Source: World Bank Group

The Karachi Electric Supply Corporation Power Plant Project provides $13.8 million to support improvements in existing steam and diesel stations, the construction of a new 30,000 kw steam station, and substantial additions to the transmission and distribution systems. The project has five components. The first improves the existing steam station by providing replacements and spare parts for boiler

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Geothermal, Commercial, Government, Residential
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about KARACHI POWER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “KARACHI POWER” is an infrastructure initiative in the Water Supply and Storage sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Karachi Electric Supply Corporation Power Plant Project provides $13.8 million to support improvements in existing steam and diesel stations, the construction of a new 30,000 kw steam station, and substantial additions to the transmission and distribution systems. The project has five components. The first improves the existing steam station by providing replacements and spare parts for boilers, heaters, pumps, and electrical equipment. Switchgear required for interconnection with the new steam station will be added. The second component improves the diesel plant. This plant consists of 19 generating sets, only 7 of which are presently usable. Replacements, spare parts, switchgear, machine tools, and new water coolers will be purchased in order to place 9 of the larger units, including those now in operation, in proper condition for continuous service. The third component constructs a new steam station, which will contain two units of 15,000 kw with 3 boilers operating at 400 lb/sq. in. pressure and 775 degrees F. The fourth component constructs transmission and distribution facilities. The fifth component funds office equipment, business machines, scales, furniture, etc.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Geothermal, Commercial, Government, Residential

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project