logo

KARACHI POWER

Sector: Water Supply and Storage • Location: Pakistan

Source: World Bank Group

Project
Closed

The Karachi Electric Supply Corporation Power Plant Project provides $13.8 million to support improvements in existing steam and diesel stations, the construction of a new 30,000 kw steam station, and substantial additions to the transmission and distribution systems. The project has five components. The first improves the existing steam station by providing replacements and spare parts for boiler

Project Information FAQ

Project Information

5 Q
The project “KARACHI POWER” is an infrastructure initiative in the Water Supply and Storage sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Karachi Electric Supply Corporation Power Plant Project provides $13.8 million to support improvements in existing steam and diesel stations, the construction of a new 30,000 kw steam station, and substantial additions to the transmission and distribution systems. The project has five components. The first improves the existing steam station by providing replacements and spare parts for boilers, heaters, pumps, and electrical equipment. Switchgear required for interconnection with the new steam station will be added. The second component improves the diesel plant. This plant consists of 19 generating sets, only 7 of which are presently usable. Replacements, spare parts, switchgear, machine tools, and new water coolers will be purchased in order to place 9 of the larger units, including those now in operation, in proper condition for continuous service. The third component constructs a new steam station, which will contain two units of 15,000 kw with 3 boilers operating at 400 lb/sq. in. pressure and 775 degrees F. The fourth component constructs transmission and distribution facilities. The fifth component funds office equipment, business machines, scales, furniture, etc.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data