logo
ProjectClosed

KARACHI WATER & SANI

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The primary objectives of the project are to : increase potable water supply, improve operation, management and financial viability of the Karachi Water and Sewerage Board (KWSB) and, improve sanitation in the city of Karachi. Specific project components include : (i) a canal and a square conduit to bring water from the Indus river, four pumping stations, two direct filtration treatment works, sto

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about KARACHI WATER & SANI

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “KARACHI WATER & SANI” is an infrastructure initiative in the Water Supply and Storage sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The primary objectives of the project are to : increase potable water supply, improve operation, management and financial viability of the Karachi Water and Sewerage Board (KWSB) and, improve sanitation in the city of Karachi. Specific project components include : (i) a canal and a square conduit to bring water from the Indus river, four pumping stations, two direct filtration treatment works, storage reservoirs, and the expansion/rehabilitation of the distribution network; (ii) three new sewage treatment works together with trunk sewers, cleaning of existing sewers and the provision of small bore sewers to low-income areas; and (iii) technical assistance to KWSB to enable it to plan and execute large scale projects, improve operation and maintenance, and improve and extend sanitation in the city and coastal areas. The objectives of the project are to: (a) increase potable water by 100 million gallons per day and further augment water availability strengthening loss reduction measures; (b) improve the financial avail of the Karachi Water and Sewerage Board (KWSB) through increased reven cost reductions, and increased operational efficiency; (c) improve the organization and management of KWSB; and (d) improve sanitation in Kar including its low-income and coastal areas. The project has three mai components: (a) water supply, including transmission works, pumping s direct filtration treatment works, storage reservoirs, distribution ma strengthening of the distribution network; (b) institutional strengthe KWSB; and (c) sanitation, including three sewage treatment works toget associated trunk sewers, repair and cleaning of existing sewers, and small-bore sewers for low income neighborhoods. The project will plac increased emphasis on leak detection and water loss reduction, contain operating costs, enhanced revenue mobilization efforts, and an in-dept examination of possible options for public/private sector participatio provision of water and sanitation services.

Original sector

FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management,Water, Sanitation and Waste Management

Budget

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project