logo

Karaganda Coal Fired Power Plants (TETS 1 & TETS 3)

Sector: Power Generation (CCGT) • Location: Kazakhstan

Source: World Bank Group

Project
Active

Karangada TETS1 and TETS3 are two coal fired power plants located in Karangada, with an installed electric capacity of 470MW and a heat capacity of 1500MW. The facility was operating at 50% of its capacity when the government partially privatized it in July 1997.

The government signed an agreement to sell up to a 70% stake to Israel-based Ormat Turbines. Under the deal, Ormat paid an initial

Project Information FAQ

Project Information

4 Q
The project “Karaganda Coal Fired Power Plants (TETS 1 & TETS 3)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kazakhstan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Karangada TETS1 and TETS3 are two coal fired power plants located in Karangada, with an installed electric capacity of 470MW and a heat capacity of 1500MW. The facility was operating at 50% of its capacity when the government partially privatized it in July 1997. The government signed an agreement to sell up to a 70% stake to Israel-based Ormat Turbines. Under the deal, Ormat paid an initial $1.3 million to acquire a 30% stake. It took over control of the plant with an option to buy up to 70% stake. Ormat would invest up to $25 million in upgrading the plant and receive 70% ownership. In 1998, Ormat and London-based, National Power set up Karaganda Power Company (KPC), a project company that would own, operate and develop the power generation facility and its associated district heating system. In September, 1998 they completed the purchase of 70% ownership in the power generation facility and of an electricity transmission and distribution company, Karaganda Regional Electricity (REC). National Power purchased a 50% stake in Karaganda Power Company for $20 million from Ormat and a 35% stake in REC. National Power and Ormat were to invest jointly up to $110-million progressively over the next three years to refurbish and extend the generating plant, district heating and distribution systems. In Nov. 1999, National Power announced the split of its international and domestic operations, and International Power plc was created. In December 1999, EBRD approved a US$40m loan package for the renovation of the two power plants. The package involved a US$22m A loan for 11 years and US$18m B loan for 7 years. In the first half of 2002, International Power plc sold its 50% interest in Karaganda Power Company (KPC) and Karaganda Regional Electricity Company to Ormat, which became the sole owner of the companies. In September 2002, UK-based Independent Power Corporation (IPC), through its subsidiary Integrated Energy Limited, purchased a 100% interest in Karaganda Power Company (KPC) and Karaganda Regional Electricity Company from Ormat. It later sold its interest in 2003. See new sponsor after 2003

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data