logo
ProjectActive

Karaganda GRES 2

Sector: Commercial • Location: Qaraghandy, Kazakhstan

Source: World Bank Group

This plant had 650-MW of installed capacity, although only 380-MW were effectively available prior to deal. The power plant was built in the 1960s and serves mainly industrial customers. It was acquired by Kazakh Power Partners Ltd., a joint venture company formed by E Prime (25%), Independent Power Corp. PLC (50%) and Samsung Corp. (25%) in March 1997. A subsidiary of e prime has been awarded the

Status
Prospective
Sector
Commercial, Metal, Wind, Government, Power Generation (CCGT), Manufacturing (Industrial)
Location
Qaraghandy, Kazakhstan
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Karaganda GRES 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Karaganda GRES 2” is an infrastructure initiative in the Commercial sector, located in Qaraghandy, Kazakhstan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

This plant had 650-MW of installed capacity, although only 380-MW were effectively available prior to deal. The power plant was built in the 1960s and serves mainly industrial customers. It was acquired by Kazakh Power Partners Ltd., a joint venture company formed by E Prime (25%), Independent Power Corp. PLC (50%) and Samsung Corp. (25%) in March 1997. A subsidiary of e prime has been awarded the O&M contract. A PPA for 170-MW has been agreed with Samsung (which will sell the electricity on the wholesale market and to a nearby copper plant it owns). Three other units at the site with combined capacity of 1,040-MW were not involved in the tender. The deal also includes a commitment by IPC to build a new coal-fired power plant with capacity of 500-1300-MW at an expected cost of $400m. In 1998, Independent Power Corp. PLC sold its interest in Karaganda GRES 2 to Kazakhmys. As of end December 2009, Kazakhmys was the sole reported investor in the project. In turn, 15% of Kazakhmys was owned by the Kazakh government, 39% floated freely on the stock exchange and 46% was owned by a small number of private investors. Kazakhmys reported that the majority of the power produced at Karaganda GRES 2 was supplied to the company's industrial complexes in Zhezkazgan, Balkhash and Karaganda Oblast; the surplus was supplied to the grid. In 2009, the launch of a US$ 23 million turbine generator boosted the plants installed capacity from 608 MW to 663MW. Kazakhmys has three captive plants for which it releases CAPEX figures jointly. Karagada GRES-2 has 76.35% (663/868) of the total installed capacity and that share has been used to compute its respective CAPEX

Original sector

Energy

Budget

Location

Country

Kazakhstan

State

Qaraghandy

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Metal, Wind, Government, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project