KARAKAYA POWER
One of 10,000+ projects Taiyo tracks in Turkey.
Source: World Bank Group
The Karakaya Hydropower Project will add 1800 MW of additional capacity to the Turkish power system, with an average yearly generation of 7750 GWh of relatively low-cost hydropower, thus contributing to reduced dependence on more expensive energy sources and savings in foreign exchange. It comprises a 173 metres high, concrete arch-gravity dam which will create 5.62 km3 live storage reservoir (9.6
- Status
- Closed
- Sector
- Mass Transit, Road, Water Supply and Storage, Rail, Power Generation (CCGT), Hydro, Cement, Government
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KARAKAYA POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Karakaya Hydropower Project will add 1800 MW of additional capacity to the Turkish power system, with an average yearly generation of 7750 GWh of relatively low-cost hydropower, thus contributing to reduced dependence on more expensive energy sources and savings in foreign exchange. It comprises a 173 metres high, concrete arch-gravity dam which will create 5.62 km3 live storage reservoir (9.6 km3 total storage) on the Euphrates river, a power house containing six 200 MW turbo-generator units and appropriate accessory equipment. It also includes resettlement of population, estimated at 17,000 living in 34 villages, and relocation of existing railway lines (33 kms), roads (35 kms) and two bridges. In addition to help meeting growing power demand in Turkey, the project, together with the exisiting Keban dam (16.3 km3 of live storage) will result in a better regulation of Euphrates river-flows, thereby benefitting power and irrigation projects downstream. The project faces no special risks, although realization of benefits will depend heavily on adequate and timely coordination of activities during project implementation, including adequate financing. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Turkey |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Water Supply and Storage, Rail, Power Generation (CCGT), Hydro, Cement, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
