logo

KARAKAYA POWER

Sector: Mass Transit • Location: Turkey

Source: World Bank Group

Project
Closed

The Karakaya Hydropower Project will add 1800 MW of additional capacity to the Turkish power system, with an average yearly generation of 7750 GWh of relatively low-cost hydropower, thus contributing to reduced dependence on more expensive energy sources and savings in foreign exchange. It comprises a 173 metres high, concrete arch-gravity dam which will create 5.62 km3 live storage reservoir (9.6

Project Information FAQ

Project Information

5 Q
The project “KARAKAYA POWER” is an infrastructure initiative in the Mass Transit sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Karakaya Hydropower Project will add 1800 MW of additional capacity to the Turkish power system, with an average yearly generation of 7750 GWh of relatively low-cost hydropower, thus contributing to reduced dependence on more expensive energy sources and savings in foreign exchange. It comprises a 173 metres high, concrete arch-gravity dam which will create 5.62 km3 live storage reservoir (9.6 km3 total storage) on the Euphrates river, a power house containing six 200 MW turbo-generator units and appropriate accessory equipment. It also includes resettlement of population, estimated at 17,000 living in 34 villages, and relocation of existing railway lines (33 kms), roads (35 kms) and two bridges. In addition to help meeting growing power demand in Turkey, the project, together with the exisiting Keban dam (16.3 km3 of live storage) will result in a better regulation of Euphrates river-flows, thereby benefitting power and irrigation projects downstream. The project faces no special risks, although realization of benefits will depend heavily on adequate and timely coordination of activities during project implementation, including adequate financing.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data