KARAKAYA POWER
Sector: Mass Transit • Location: Turkey
Source: World Bank Group
The Karakaya Hydropower Project will add 1800 MW of additional capacity to the Turkish power system, with an average yearly generation of 7750 GWh of relatively low-cost hydropower, thus contributing to reduced dependence on more expensive energy sources and savings in foreign exchange. It comprises a 173 metres high, concrete arch-gravity dam which will create 5.62 km3 live storage reservoir (9.6
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Karakaya Hydropower Project will add 1800 MW of additional capacity to the Turkish power system, with an average yearly generation of 7750 GWh of relatively low-cost hydropower, thus contributing to reduced dependence on more expensive energy sources and savings in foreign exchange. It comprises a 173 metres high, concrete arch-gravity dam which will create 5.62 km3 live storage reservoir (9.6 km3 total storage) on the Euphrates river, a power house containing six 200 MW turbo-generator units and appropriate accessory equipment. It also includes resettlement of population, estimated at 17,000 living in 34 villages, and relocation of existing railway lines (33 kms), roads (35 kms) and two bridges. In addition to help meeting growing power demand in Turkey, the project, together with the exisiting Keban dam (16.3 km3 of live storage) will result in a better regulation of Euphrates river-flows, thereby benefitting power and irrigation projects downstream. The project faces no special risks, although realization of benefits will depend heavily on adequate and timely coordination of activities during project implementation, including adequate financing. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
