Karavasta Solar
Sector: Warehouse • Location: Albania
Source: International Finance Corporation (IFC)
The proposed investment will support the development of the Karavasta Solar Project (the Project), a 140MW (installed capacity) solar PV plant to be located in the Divjaka and Fier municipalities of Albania. The project is to be developed by Karavasta Solar sh.p.k, an SPV established by Voltalia S.A (Voltalia or the Company”) (). Voltalia has been selected through competiti
- Status
- Prospective
- Sector
- Warehouse, Residential, Road, Power Transmission, Power Generation (CCGT), Solar, Water Supply and Storage, Telecommunications, Government, Commercial, Waste Processing and Treatment
- Location
- Albania
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Karavasta Solar
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed investment will support the development of the Karavasta Solar Project (the Project), a 140MW (installed capacity) solar PV plant to be located in the Divjaka and Fier municipalities of Albania. The project is to be developed by Karavasta Solar sh.p.k, an SPV established by Voltalia S.A (Voltalia or the Company”) (https://www.voltalia.com). Voltalia has been selected through competitive tender to design, construct, and operate the project for 30 years and will be acting as both Engineering, Procurement, and Construction (EPC) and Operations & Maintenance (O&M) contractor. Construction work began in June 2022 and will take approximately 14 months.The PV plant will be a medium-size utility-grade grid-connected solar-PV power system consisting of approximately 241,400 PV panels attached to model tracking systems, string inverters, 220 kV step-up substation (to be constructed within the proposed boundary of the site), and grid connection equipment. The PV plant will be connected to the national grid via the existing Fier substation and a 19.2 km long, 220 kV overhead transmission line (OHL) to be built by Voltalia and transferred to the transmission system operator upon commissioning. Additional infrastructure will include a building to accommodate SCADA equipment, onsite buried cabling, access tracks, material storage, and temporary office facilities.The PV plant site is located within the Libofsha administrative unit, municipality of Fier, and lies approximately 5 km south of the Karavasta Lagoon. The available land for the PV plant is 196 hectares (ha), with the proposed PV layout footprint occupying a total of 185 hectares. The nearest villages are Hasturkas and Ndërnenas, which lie 800 m and 1500 m, respectively, to the east of the project area. The 220 kV OHL will run approximately 19.2 km in a southeasterly direction from the project site to the Fier substation. The PV plant site is adjacent to Divjaka-Karavasta National Park, a Candidate Emerald Site under the Bern Convention encompassing Karavasta Lagoon Ramsar Site. It is a highly important natural area in Albania. The project site also partially overlaps (by approximately 50%) with the Karavasta Lagoon Key Biodiversity Area (KBA) and Important Bird Area (IBA) designated for globally threatened bird species, important congregations of wintering and breeding waterbirds, and the endemic Albanian Water Frog.Voltalia commenced an enabling works program in June 2022 within the PV site limited to fencing, drainage, road upgrades, and earthworks. Before beginning site activities, Voltalia implemented a risk and impacts identification process and developed a program of measures and actions to avoid, minimize, compensate for, or offset potential adverse impacts, aligned with the mitigation hierarchy described in IFC PS1. An independent environmental and social consultant (IESC) was engaged to conduct a physical site visit during the enabling works program. |
Original sector | V-BF - Solar - Renewable Energy Generation |
Location
Country | Albania |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Warehouse, Residential, Road, Power Transmission, Power Generation (CCGT), Solar, Water Supply and Storage, Telecommunications, Government, Commercial, Waste Processing and Treatment |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in Albania
- Energji Ashta Shpk (Ashta)
- Know-How Enhancement for Sustainable transportation organisation
- Contribution to the enhancement of olive sector by promoting certified good cultivation practices, applying precision agriculture technologies, creating innovative local products and supporting relevant SMEs
- Urban water full cycle: from its source to its end-users and back to the environment
- Enhancing Olive Oil Production with the use of Innovative ICT
- New Port of Shengjin
- VISP: OSHEE COVID-19 Response
- FIF - PRS - Union Bank Albania (EFSD+2)
