logo

Kariba Dam Rehabilitation Project

Sector: Water Supply and Storage • Location: Eastern and Southern Africa

Source: World Bank

Project
Active

The development objective for the Kariba Dam Rehabilitation Project for Zambia is to assist in improving the safety and reliability of the Kariba Dam. This will be done by supporting the reshaping of the plunge pool, refurbishment of the spillway and enhancing operations to bring them in line with international dam safety standards. The project consists of the following three components: (1) Insti

Project Information FAQ

Project Information

5 Q
The project “Kariba Dam Rehabilitation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Eastern and Southern Africa. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective for the Kariba Dam Rehabilitation Project for Zambia is to assist in improving the safety and reliability of the Kariba Dam. This will be done by supporting the reshaping of the plunge pool, refurbishment of the spillway and enhancing operations to bring them in line with international dam safety standards. The project consists of the following three components: (1) Institutional project support. The objective of this component is to provide the necessary support to assist the Zambezi River Authority in securing the long-term safety and reliability of the Kariba Dam Hydro-Electric Scheme. Activities of this component include: (i) technical services and supervision consultant; (ii) dam break analysis; (iii) panel of experts; (iv) Dispute Adjudication Board; (v) environmental and social assessment; and, (vi) audits, evaluations and other studies. (2) Plunge pool. The objective of this component is to stabilize the plunge pool and prevent further scouring. Activities of this component include: (i) Plunge pool reshaping civil works; (ii) carrying out of additional engineering studies, investigations and surveys, and supply of equipment as might be needed during implementation; (iii) provision of technical services for the monitoring of the plunge pool reshaping; and, (iv) carrying out of visibility and communications activities. (3) Spillway refurbishment. The objective of this component is to improve the operation and prevent potential failure of the spillway control facility. Activities of this component include: (i) Spillway refurbishment contract; and (ii) Additional engineering studies, investigations, surveys and equipment as may be required. Progress toward achieving the project outcomes will be measured against the following: (i) Number of people benefitting in the project area through risk reduction and avoided disaster, and (ii) Emergency Preparedness Plan adopted and operationalized.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data