Kariba Dam Rehabilitation Project
Sector: Water Supply and Storage • Location: Eastern and Southern Africa
Source: World Bank Group
The development objective for the Kariba Dam Rehabilitation Project for Zambia is to assist in improving the safety and reliability of the Kariba Dam. This will be done by supporting the reshaping of the plunge pool, refurbishment of the spillway and enhancing operations to bring them in line with international dam safety standards. The project consists of the following three components: (1) Insti
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Hydro, Forest Products and Packaging, Government
- Location
- South Africa
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Kariba Dam Rehabilitation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective for the Kariba Dam Rehabilitation Project for Zambia is to assist in improving the safety and reliability of the Kariba Dam. This will be done by supporting the reshaping of the plunge pool, refurbishment of the spillway and enhancing operations to bring them in line with international dam safety standards. The project consists of the following three components: (1) Institutional project support. The objective of this component is to provide the necessary support to assist the Zambezi River Authority in securing the long-term safety and reliability of the Kariba Dam Hydro-Electric Scheme. Activities of this component include: (i) technical services and supervision consultant; (ii) dam break analysis; (iii) panel of experts; (iv) Dispute Adjudication Board; (v) environmental and social assessment; and, (vi) audits, evaluations and other studies. (2) Plunge pool. The objective of this component is to stabilize the plunge pool and prevent further scouring. Activities of this component include: (i) Plunge pool reshaping civil works; (ii) carrying out of additional engineering studies, investigations and surveys, and supply of equipment as might be needed during implementation; (iii) provision of technical services for the monitoring of the plunge pool reshaping; and, (iv) carrying out of visibility and communications activities. (3) Spillway refurbishment. The objective of this component is to improve the operation and prevent potential failure of the spillway control facility. Activities of this component include: (i) Spillway refurbishment contract; and (ii) Additional engineering studies, investigations, surveys and equipment as may be required. Progress toward achieving the project outcomes will be measured against the following: (i) Number of people benefitting in the project area through risk reduction and avoided disaster, and (ii) Emergency Preparedness Plan adopted and operationalized. |
Original sector | FY17 - Energy and Extractives,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | South Africa |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Hydro, Forest Products and Packaging, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Eastern and Southern Africa
- AFCRI-Sustainable Groundwater Management in SADC Member States
- AFR RI-Regional Great Lakes Integrated Agriculture Development Project
- AFR RI-Regional Great Lakes Integrated Agriculture Development Project
- Nile Cooperation for Results Project (NCORE) - Additional Financing 2
- Nile Cooperation for Results Project (NCORE) - Additional Financing 2
- Regional Climate Resilience Program for Eastern and Southern Africa Project
- Nile Cooperation for Climate Resilience
- Agricultural Productivity Program for Southern Africa - Angola & Lesotho
