logo

Kariba Dam Rehabilitation Project

Sector: Water Supply and Storage • Location: Eastern and Southern Africa

Source: World Bank Group

Project
Active

The development objective for the Kariba Dam Rehabilitation Project for Zambia is to assist in improving the safety and reliability of the Kariba Dam. This will be done by supporting the reshaping of the plunge pool, refurbishment of the spillway and enhancing operations to bring them in line with international dam safety standards. The project consists of the following three components: (1) Insti

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Hydro, Forest Products and Packaging, Government
Location
South Africa
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kariba Dam Rehabilitation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kariba Dam Rehabilitation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Eastern and Southern Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective for the Kariba Dam Rehabilitation Project for Zambia is to assist in improving the safety and reliability of the Kariba Dam. This will be done by supporting the reshaping of the plunge pool, refurbishment of the spillway and enhancing operations to bring them in line with international dam safety standards. The project consists of the following three components: (1) Institutional project support. The objective of this component is to provide the necessary support to assist the Zambezi River Authority in securing the long-term safety and reliability of the Kariba Dam Hydro-Electric Scheme. Activities of this component include: (i) technical services and supervision consultant; (ii) dam break analysis; (iii) panel of experts; (iv) Dispute Adjudication Board; (v) environmental and social assessment; and, (vi) audits, evaluations and other studies. (2) Plunge pool. The objective of this component is to stabilize the plunge pool and prevent further scouring. Activities of this component include: (i) Plunge pool reshaping civil works; (ii) carrying out of additional engineering studies, investigations and surveys, and supply of equipment as might be needed during implementation; (iii) provision of technical services for the monitoring of the plunge pool reshaping; and, (iv) carrying out of visibility and communications activities. (3) Spillway refurbishment. The objective of this component is to improve the operation and prevent potential failure of the spillway control facility. Activities of this component include: (i) Spillway refurbishment contract; and (ii) Additional engineering studies, investigations, surveys and equipment as may be required. Progress toward achieving the project outcomes will be measured against the following: (i) Number of people benefitting in the project area through risk reduction and avoided disaster, and (ii) Emergency Preparedness Plan adopted and operationalized.

Original sector

FY17 - Energy and Extractives,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

South Africa

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Hydro, Forest Products and Packaging, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project