logo

Kariba South Power Station Expansion

Sector: Power Generation (CCGT) • Location: Zimbabwe

Source: The Chronicle - Breaking news

Project
Completed

The Kariba South Power Station expansion project increased Zimbabwe’s power generation capacity by adding two new 150 MW units to the existing hydroelectric power station. Completed in March 2018, this project aimed to alleviate power shortages.

Status
Closed
Sector
Power Generation (CCGT)
Location
Zimbabwe
Updated
22 Jul 2026
Source
The Chronicle - Breaking news

ConstructChat

Ask ConstructChat about Kariba South Power Station Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kariba South Power Station Expansion” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Zimbabwe. Taiyo aggregates data on it from The Chronicle - Breaking news.

Participants

Company

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Kariba South Power Station expansion project increased Zimbabwe’s power generation capacity by adding two new 150 MW units to the existing hydroelectric power station. Completed in March 2018, this project aimed to alleviate power shortages.

Original sector

Energy

Budget

Location

Country

Zimbabwe

Source

Source

The Chronicle - Breaking news

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-04-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project