Kariba South Power Station Expansion
Sector: Power Generation (CCGT) • Location: Zimbabwe
Source: The Chronicle - Breaking news
The Kariba South Power Station expansion project increased Zimbabwe’s power generation capacity by adding two new 150 MW units to the existing hydroelectric power station. Completed in March 2018, this project aimed to alleviate power shortages.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Zimbabwe
- Updated
- 22 Jul 2026
- Source
- The Chronicle - Breaking news
ConstructChat
Ask ConstructChat about Kariba South Power Station Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Kariba South Power Station expansion project increased Zimbabwe’s power generation capacity by adding two new 150 MW units to the existing hydroelectric power station. Completed in March 2018, this project aimed to alleviate power shortages. |
Original sector | Energy |
Budget |
Location
Country | Zimbabwe |
Source
Source | The Chronicle - Breaking news |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-04-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Zimbabwe
- African Power
- Pomona Waste Management
- Zimbabwe - Alaska – Karoi Power Transmission Reinforcement Project
- Zimbabwe - Emergency Power Infrastructure Rehabilitation Project – Phase II
- Zimbabwe - Urgent Water Supply and Sanitation Rehabilitation Project – Consolidation Works
- WANKIE POWER
- ZESA POWER IV (CAHORA BASSA)
- Kupinga small hydropower
