logo

KARNAFULI IRRIGATION

Sector: Road • Location: Bangladesh

Source: World Bank Group

Project
Closed

The Karnafuli Irrigation Project works include: Halda Unit: (a) sixteen gated regulators at the outlets of channels to the Karnafuli and Halda Rivers; (b) improvement of 41 miles of existing channels and the excavation of 6.5 miles of new channels; (d) twenty-seven relift pumping stations with a total of 71 low-lift, 2 cfs pumps; (e) about 300 low-lift, diesel-powered two cfs pumps to raise water

Project Information FAQ

Project Information

5 Q
The project “KARNAFULI IRRIGATION” is an infrastructure initiative in the Road sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Karnafuli Irrigation Project works include: Halda Unit: (a) sixteen gated regulators at the outlets of channels to the Karnafuli and Halda Rivers; (b) improvement of 41 miles of existing channels and the excavation of 6.5 miles of new channels; (d) twenty-seven relift pumping stations with a total of 71 low-lift, 2 cfs pumps; (e) about 300 low-lift, diesel-powered two cfs pumps to raise water from the channels to adjacent farm lands; (f) small earthfill channel check structures; and (g) flood protection embankments. Ichamati Unit: (a) a main pumping plant at Mahfez Channel; (b) a relift pumping plant; (c) power transmission lines to the pumping plants; (d) three gated regulators at the outlets of channels to the Karnafuli and Ichamati Rivers; (e) improvement of 16 miles of existing khals and the excavation of four miles of new channels; (f) about 70 low-lift, diesel-powered, two cfs pumps to raise water from the channels to adjacent farmlands; (g) a box culvert under the Chittagong-Kaptai Highway; (h) two channel check structures, one of them gated, and (i) flood protection embankments 12 mi long, along with an exterior diversion channel.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data