KARNAFULI IRRIGATION
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Karnafuli Irrigation Project works include: Halda Unit: (a) sixteen gated regulators at the outlets of channels to the Karnafuli and Halda Rivers; (b) improvement of 41 miles of existing channels and the excavation of 6.5 miles of new channels; (d) twenty-seven relift pumping stations with a total of 71 low-lift, 2 cfs pumps; (e) about 300 low-lift, diesel-powered two cfs pumps to raise water
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government
- Location
- Bangladesh
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KARNAFULI IRRIGATION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Karnafuli Irrigation Project works include: Halda Unit: (a) sixteen gated regulators at the outlets of channels to the Karnafuli and Halda Rivers; (b) improvement of 41 miles of existing channels and the excavation of 6.5 miles of new channels; (d) twenty-seven relift pumping stations with a total of 71 low-lift, 2 cfs pumps; (e) about 300 low-lift, diesel-powered two cfs pumps to raise water from the channels to adjacent farm lands; (f) small earthfill channel check structures; and (g) flood protection embankments. Ichamati Unit: (a) a main pumping plant at Mahfez Channel; (b) a relift pumping plant; (c) power transmission lines to the pumping plants; (d) three gated regulators at the outlets of channels to the Karnafuli and Ichamati Rivers; (e) improvement of 16 miles of existing khals and the excavation of four miles of new channels; (f) about 70 low-lift, diesel-powered, two cfs pumps to raise water from the channels to adjacent farmlands; (g) a box culvert under the Chittagong-Kaptai Highway; (h) two channel check structures, one of them gated, and (i) flood protection embankments 12 mi long, along with an exterior diversion channel. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Bangladesh |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
