logo
ProjectClosed

KARNAFULI IRRIGATION

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The Karnafuli Irrigation Project works include: Halda Unit: (a) sixteen gated regulators at the outlets of channels to the Karnafuli and Halda Rivers; (b) improvement of 41 miles of existing channels and the excavation of 6.5 miles of new channels; (d) twenty-seven relift pumping stations with a total of 71 low-lift, 2 cfs pumps; (e) about 300 low-lift, diesel-powered two cfs pumps to raise water

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government
Location
Bangladesh
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about KARNAFULI IRRIGATION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “KARNAFULI IRRIGATION” is an infrastructure initiative in the Road sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Karnafuli Irrigation Project works include: Halda Unit: (a) sixteen gated regulators at the outlets of channels to the Karnafuli and Halda Rivers; (b) improvement of 41 miles of existing channels and the excavation of 6.5 miles of new channels; (d) twenty-seven relift pumping stations with a total of 71 low-lift, 2 cfs pumps; (e) about 300 low-lift, diesel-powered two cfs pumps to raise water from the channels to adjacent farm lands; (f) small earthfill channel check structures; and (g) flood protection embankments. Ichamati Unit: (a) a main pumping plant at Mahfez Channel; (b) a relift pumping plant; (c) power transmission lines to the pumping plants; (d) three gated regulators at the outlets of channels to the Karnafuli and Ichamati Rivers; (e) improvement of 16 miles of existing khals and the excavation of four miles of new channels; (f) about 70 low-lift, diesel-powered, two cfs pumps to raise water from the channels to adjacent farmlands; (g) a box culvert under the Chittagong-Kaptai Highway; (h) two channel check structures, one of them gated, and (i) flood protection embankments 12 mi long, along with an exterior diversion channel.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Bangladesh

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project